Skip to content

Program · canonical status 2026-10-09

An auditable computational laboratory — not a portal product.

Astral Gate is an auditable computational semiclassical-gravity and numerical-GR research program. Wormhole / backreaction physics is the ambitious application. We are not selling a gate.

BEBOP_OCTOBER_RECONCILE_2026-10-09 = COMPLETE / HOLD

October research update: scalar calculation repaired; independent trace agreement at r=6M under an empirical numerical allowance.

Three results stay separate. On 21 September this pipeline’s predeclared ε₁ oscillation passed on the unseen window ω ∈ [10.40, 10.90] only. Digitized published curves agree 12/12 at four radii, and the multi-radius chain remains MRX_R_INVALID. On 9 October the repaired scalar trace agrees with the stored PMR trace at r = 6M under a combined empirical allowance. None of these is an independently validated full stress tensor. The figures are the recorded research summaries, not a recalculation performed by this website.

What changed

The massless scalar subtraction was repaired and compared with the stored PMR trace at one radius, r = 6M. A September confirmation of the predeclared oscillation, a narrow published-curve comparison, and a target-exposed Hadamard derivation are now on the ledger as separate, narrower results.

Evidence

As of 2026-10-09. Scalar trace status TRACE_R6_NUMERICAL_PASS_UNDER_EMPIRICAL_BUDGET. Residual 1.5474844313788875×10⁻¹¹ against a combined empirical allowance 3.861830391164996×10⁻⁹. CNG confirmation is a 21 September narrow pass on ω ∈ [10.40, 10.90]. Published-curve agreement is 12/12 at four radii and does not repair the MRX_R_INVALID chain.

Limit

The allowance is empirical and dominated by the inherited PMR estimate. It is not a statistical confidence interval or a rigorous infinite-tail bound. Nine nearby scalar nodes support the derivative at r = 6M; they are not nine trace validations. No validated throat, backreaction solution, stability result, or engineering readiness.

Next step

Supported omitted-mode remainder control for the differentiated scalar sum; independent trace comparisons around r = 5.5M and 6.5M; then independent tensor components with consistent conventions, trace, conservation, and PMR comparison.

Branch G/B1 remains PARTIAL. As of 9 October 2026 the repaired massless scalar trace agrees with the stored PMR trace at r=6M under a combined empirical allowance. That is not an independently validated full stress tensor. A 21 September CNG window passed narrowly; global structure is not established. The mixed-time sign question remains EXTERNALLY REVIEWABLE, paused, and unconfirmed. Production sign is not flipped.

NEXT Supported omitted-mode remainder control for the differentiated scalar sum; independent trace comparisons around r = 5.5M and 6.5M; then independent tensor components with consistent conventions, trace, conservation, and PMR comparison.

The instrument we are trying to build

B1 unlocks trust in the instrument, not belief in the hypothesis.

B1 does not establish an Astral Gate. B1 asks whether the numerical instrument we intend to use for much harder spacetime questions can correctly reproduce a known quantum stress-energy benchmark.

B1 is calibration of the numerical instrument Astral Gate needs before testing unknown geometries. A successful B1 would not prove a gate; it would establish enough confidence in the quantum stress-tensor engine to begin broader benchmark work. Ultimately, that engine could become useful well outside Astral Gate for black-hole quantum physics, semiclassical backreaction, wormhole tests, and curved-spacetime QFT.

Gμν[g]=8πGc4 ⟨Tμν[g,Ψ]⟩renG_{\mu\nu}[g] = \dfrac{8\pi G}{c^{4}}\,\langle T_{\mu\nu}[g,\Psi]\rangle_{\mathrm{ren}}

The left side describes spacetime curvature. The right side describes the quantum stress-energy sourcing it. Displayed form is a minimal schematic, not the uniquely complete equation.

Known benchmark → validated engine → novel geometry → backreaction. B1 is the first major calibration. It is PARTIAL. Nothing downstream is marked done.

  1. Known physics
  2. Calibrate
  3. Scalar r=6 empirical
  4. Validate
  5. Test new geometry
  6. Calculate quantum stress
  7. Backreaction
  8. Admissibility
  9. Stability
  10. Physical scale

Outside-project reproducibility contribution

Isolated from whether gateway physics succeeds

ASTRAL GATE GOAL

Validate semiclassical RSET machinery. B1 remains PARTIAL. Production RSET remains HOLD.

EXTERNAL REPRODUCIBILITY RESULT

Potential sign inconsistency in a displayed extended-coordinate mixed-time derivative formula, isolated into a standalone literature/reproducibility pack with no Astral Gate RSET imports.

During validation of the project's semiclassical stress-tensor benchmark, a potential sign inconsistency in a displayed mixed-time derivative formula was isolated and converted into a standalone reproducibility test independent of the Astral Gate RSET implementation. The package is publicly reviewable regardless of whether the broader Astral Gate research ultimately succeeds. EXTERNALLY REVIEWABLE. NOT CONFIRMED.

Current next action

Remainder control, then traces at 5.5M and 6.5M, then components.

OPEN NUMERICAL WORK

  1. 01. Omitted-mode remainder control
  2. 02. Traces around r = 5.5M and 6.5M
  3. 03. Individual tensor components

PAUSED Mτ LANE

Do not flip the production Mτ sign. The displayed-formula question remains externally reviewable, not confirmed, archaeology unknown. Authors have not been contacted. Ward, four-point assembly, and infinite-support Abel stay open.

Canonical stack

RADIAL_MODE_ENGINE
PASS
PHI2_DERIVATIVES
PASS_UNDER_THEN_CURRENT_TOLERANCE
SYNGE_WAB_RECONSTRUCTION
PASS
HESSIAN_SYMBOLIC_VERIFY
PASS
DIRECT_TBO_RSET_REFEREE_SOURCE
PASS
DIRECT_ANGULAR_REFEREE
PASS
PIPELINES_AGREE
PASS
TRACE_DEV
HISTORICAL_PASS_NOT_UNIVERSAL
WARD_TR_SPLIT_BC_ROBUST
PASS
WARD_DEV
HOLD
WARD_GLOBAL_SIGN_FIX
REJECTED
HOWARD_4PT_SCOREBOARD
HOLD
RSET_ASSEMBLY_DEV
HOLD
FOUR_POINT_DEV
HOLD
XI12_NEAR_HORIZON_DISCREPANCY
HOLD
ELL_SUPPORT_CAUSE_SUPPORTED
TRUE
ANGULAR_PLATEAU_STATUS
PASS
ADAPTIVE_GATE_PROSPECTIVE
PASS
ANGULAR_GATE_VALIDATED_PROSPECTIVELY
TRUE
SPARSE_EXTENSION_10_12
PASS
PMR_INPUT_VALIDITY_OMEGA_LE_8
PASS_CONDITIONAL_ON_ELL_CONVERGENCE
CERTIFIED_POINTWISE_DOMAIN_TO_OMEGA12
PASS_CONDITIONAL_ON_ELL_GATE
PMR_HIGH_OMEGA_INPUT_VALIDITY
UNESTABLISHED_BEYOND_OMEGA12
DECAYING_HIGH_OMEGA_TAIL_DEMONSTRATED
FALSE
ASYMPTOTIC_REGIME_IDENTIFIED
FALSE
FREQUENCY_SUPPORT_CONVERGED
FALSE
ASYMPTOTIC_EXPECTATION
GROWTH_EXPECTED_PRE_GI
ASYMPTOTIC_STRUCTURE
MIXED
ASYMPTOTIC_STRUCTURE_MIXED_GLOBAL_CONFIRM
FALSE
DENSE_CNG_SCAN_9_8_10_3
51/51 ANGULAR_ACCEPTED
CNG_DISCOVERY
STRONG_EVIDENCE
OLD_SURROGATE_DISCRIMINATOR
INVALIDATED_DO_NOT_USE
OFFLINE_RESCORE
UNCLASSIFIED_CRITERIA_GAP
OUR_NUMERICAL_CNG_STRUCTURE_CONFIRMED
FALSE
CNG_CONFIRMATION_SCAN
NARROW_PASS_2026-09-21
CNG_GLOBAL_STRUCTURE
NOT_ESTABLISHED
FINITE_SUPPORT_SELF_CANCELLATION
IMPLEMENTED_2026-10-03
INFINITE_SUPPORT_INTEGRAL
NOT_PROVED
HH_PUBLISHED_CURVE
TRUE_NARROW_12_OF_12
MRX_FULL_CHAIN
MRX_R_INVALID
R5_ANALYSIS_V1
ANALYSIS_R_INVALID
LOCAL_E_HADAMARD
E_DERIVATION_ONLY_CANDIDATE
E_VALIDATED
FALSE
SCALAR_TRACE_R6
EMPIRICAL_BUDGET_PASS
HH_INDEPENDENT_RSET_REPRODUCTION
FALSE
ABEL_MATH_SYNTHETIC_REFEREE
PASS_DIAGNOSTIC
ABEL_PRODUCTION_VALIDATED
FALSE
ABEL_PRIMARY_SUSPECT
SUPPORT
ABEL_SUPPORT_TEST
UNRESOLVED
ABEL_CROSSCHECK
HOLD
PMR_PHASE_C
PARTIAL
ABEL_LIMIT_ORDER
OMEGA_TO_INFINITY_FIRST
POTENTIAL_PUBLISHED_MTAU_SIGN_ISSUE
EXTERNALLY_REVIEWABLE
MT_CONFIRMED
FALSE
MT_ARCHAEOLOGY
UNKNOWN
MTAU_LANE
PAUSED_PENDING_EXTERNAL_CLARIFICATION
SIGN_VERDICT
UNRESOLVED
INTERNAL_SIGN_DERIVATIONS
3/3 PLUS
PUBLIC_REPRO_PACK_READY
YES
AUTHOR_CONTACT_READY
YES
AUTHOR_NOTE_SENT
NO
PHASE_D_PUBLISHED_NUMERICS
UNKNOWN
PRODUCTION_SIGN_FLIP
NO
PRODUCTION_GRID_AUTHORIZED
FALSE
B1_HH_REPRODUCTION_CLAIMED
FALSE
B1
PARTIAL
BRANCH_G
OPEN
BRANCH_G_DEAD
FALSE
TERNO_APPLICABILITY
PARTIAL
CASIMIR_ROUTE
CLOSED
SPECIES_10E72_ROUTE
WITHDRAWN
RIG1_HARDWARE
FROZEN
GATE
NO
QC
OFF

Instrument chain

Calibration first. Engineering last.

Future stages are locked on purpose. B1 is CURRENT and PARTIAL. A pass would unlock the next benchmarks, not a gate.

  1. Calibration

    • B0 bitensor / thermal checksumDONE
    • B1 Schwarzschild Hartle–HawkingCURRENT · PARTIAL
    • PMR adaptive angular-convergence gatePROSPECTIVE PASS · CLOSED GATE
    • PMR sparse 10/12 + asymptotic auditDONE · MIXED / GROWTH EXPECTED PRE-GI
    • CNG discovery scan ε₁=37.520 SEP FREEZE · D FAIL RETAINED
    • CNG confirmation scan 10.40–10.90NARROW PASS · 21 SEP · NOT GLOBAL
    • Published HH curves12/12 NARROW · CHAIN INVALID
    • Scalar trace at r=6MEMPIRICAL PASS · NOT FULL RSET
  2. Multi-benchmark validation

    • B2 BoulwareLOCKED
    • B3 additional states / geometriesLOCKED
  3. Discovery mode

    • Novel fixed-background geometryLOCKED
  4. Self-consistent physics

    • Semiclassical backreactionLOCKED
  5. Admissibility

    • QEI / ANEC / regularity / stabilityLOCKED
  6. Physical scale

    • Macroscopic viabilityLOCKED
  7. Engineering

    • Only if everything above survivesLOCKED
  8. Future and locked stages are not accomplished. B1 is CURRENT and PARTIAL. PMR gate PASS is instrument work, not a B1 pass. GATE = NO.

Branch G technical roadmap

  1. 01Radial GreenDONE
  2. 02Hadamard source / subtraction (historical scope)DONE
  3. 03⟨φ²⟩DONE
  4. 04⟨φ²⟩ derivatives (old tolerance)DONE
  5. 05Initial four-point RSET assembly machineryDONE
  6. 06Trace machinery (not the October comparison)DONE
  7. 07Public Mτ reproducibility packDONE
  8. 08PMR ℓ-support isolationDONE
  9. 09ω=8 angular plateauDONE
  10. 10Adaptive angular-convergence gate (prospective)DONE
  11. 11Certified sparse extension ω=10,12DONE
  12. 12PMR analytic large-ω expectation auditDONE
  13. 13Dense CNG discovery scan ω∈[9.8,10.3]DONE
  14. 14CNG window confirmation ω∈[10.40,10.90]DONE
  15. 15Normalized finite-support self-cancellationDONE
  16. 16Published HH curve comparison (narrow)DONE
  17. 17Hadamard e derivation candidateDONE
  18. 18Repaired scalar trace at r=6M (empirical)DONE
  19. 19Omitted-mode remainder controlOPEN
  20. 20Independent trace at r=5.5M and 6.5MOPEN
  21. 21Independent tensor componentsOPEN
  22. 22External Mτ source / sign clarificationOPEN
  23. 23WardHOLD
  24. 24Four-point benchmarkHOLD
  25. 25Infinite-support generalized integralHOLD
  26. 2635-row production gridLOCKED
  27. 27B1 reproductionLOCKED
  28. 28B2 BoulwareLOCKED
  29. 29Novel fixed-background geometryLOCKED
  30. 30BackreactionLOCKED
  31. 31Stability / QEI / ANECLOCKED
  32. 32Physical-scale / engineering questionLOCKED

Claim discipline

  • Say: the 9 October scalar trace at r=6M passes under a combined empirical allowance. That allowance is mostly the inherited PMR estimate. It is not a confidence interval or a proved tail bound.
  • Say: the 21 September result is this pipeline’s predeclared oscillatory structure on ω ∈ [10.40, 10.90]. Do not call that a global CNG confirmation.
  • Say: 12/12 digitized published-curve agreement is narrow. The full chain remains MRX_R_INVALID. r=5 v1.0 remains ANALYSIS_R_INVALID. A v1.1 pass does not replace it.
  • Say: Hadamard a, b, e matching is E_DERIVATION_ONLY_CANDIDATE. Target-exposed. E_VALIDATED = false.
  • Say: ASYMPTOTIC_STRUCTURE_MIXED. Pointwise decay of F_reg is not required before generalized integration.
  • Do not flatten published-curve agreement, the scalar trace check, and full tensor validation into one claim.
  • Do not carry “complete m=6”, “no blockers”, or a blanket TRACE PASS forward as a current universal claim. Those stamps keep their dates and their original tolerances.
  • Do not say the paper is wrong, the authors made an error, or the published RSET is wrong.
  • Do not say Hartle–Hawking has been independently reproduced, Abel production has been validated as an infinite-support integral, or Howard has been reproduced.
  • Do not say a traversable gate has been demonstrated, a self-consistent semiclassical throat has been found, or Branch G works.
  • Do not say the latest PMR numbers are physical RSET measurements.
  • Do not flip the production Mτ sign. Do not send the author note. Do not publish an accusation.
  • Do not treat finite-support self-cancellation as a proof of the infinite-frequency limit.
  • This website update does not launch a research job, RSET promotion, the Howard 35-row grid, B2, a novel throat, or backreaction.
  • Physical gate not established. No portal, warp drive, stable throat, or minimum mass has been demonstrated.
  • The sign issue is completely separated from portal / gateway claims.
  • Casimir route remains CLOSED. ~10⁷² species route remains WITHDRAWN. Rig-1 hardware remains FROZEN.
  • Old fixed-ℓ high-ω PMR data are not trustworthy production Abel input.
  • Numbers on the October pages are taken from the editorial research summaries. This website did not re-run those calculations.