Skip to content

Program dependency chain

Calibration first. Engineering last.

October research update: scalar calculation repaired; independent trace agreement at r=6M under an empirical numerical allowance. Broader geometry, backreaction, and engineering stay locked. GATE = NO.

B1 CURRENT · PARTIALSCALAR TRACE · EMPIRICALCNG WINDOW · NARROW PASSGLOBAL CNG NOT ESTABLISHEDGATE NO

Intended progression

  1. Known physics
  2. Calibrate
  3. Scalar r=6 empirical
  4. Validate
  5. Test new geometry
  6. Calculate quantum stress
  7. Backreaction
  8. Admissibility
  9. Stability
  10. Physical scale

We are not at Level 4 or above. B1 itself is PARTIAL. A narrow CNG window pass and a narrow published-curve comparison are not a B1 pass. The current open work is remainder control, neighboring traces, then tensor components. GATE = NO.

Instrument chain

What B1 would unlock, and what stays locked

  1. Calibration

    • B0 bitensor / thermal checksumDONE
    • B1 Schwarzschild Hartle–HawkingCURRENT · PARTIAL
    • PMR adaptive angular-convergence gatePROSPECTIVE PASS · CLOSED GATE
    • PMR sparse 10/12 + asymptotic auditDONE · MIXED / GROWTH EXPECTED PRE-GI
    • CNG discovery scan ε₁=37.520 SEP FREEZE · D FAIL RETAINED
    • CNG confirmation scan 10.40–10.90NARROW PASS · 21 SEP · NOT GLOBAL
    • Published HH curves12/12 NARROW · CHAIN INVALID
    • Scalar trace at r=6MEMPIRICAL PASS · NOT FULL RSET
  2. Multi-benchmark validation

    • B2 BoulwareLOCKED
    • B3 additional states / geometriesLOCKED
  3. Discovery mode

    • Novel fixed-background geometryLOCKED
  4. Self-consistent physics

    • Semiclassical backreactionLOCKED
  5. Admissibility

    • QEI / ANEC / regularity / stabilityLOCKED
  6. Physical scale

    • Macroscopic viabilityLOCKED
  7. Engineering

    • Only if everything above survivesLOCKED
  8. Future and locked stages are not accomplished. B1 is CURRENT and PARTIAL. PMR gate PASS is instrument work, not a B1 pass. GATE = NO.

Branch G technical roadmap

Live stack, unchanged

This is the existing Branch G ledger. Stamps are not promotional. HOLD is not PASS. LOCKED stages have not been run.

  1. 01Radial GreenDONE
  2. 02Hadamard source / subtraction (historical scope)DONE
  3. 03⟨φ²⟩DONE
  4. 04⟨φ²⟩ derivatives (old tolerance)DONE
  5. 05Initial four-point RSET assembly machineryDONE
  6. 06Trace machinery (not the October comparison)DONE
  7. 07Public Mτ reproducibility packDONE
  8. 08PMR ℓ-support isolationDONE
  9. 09ω=8 angular plateauDONE
  10. 10Adaptive angular-convergence gate (prospective)DONE
  11. 11Certified sparse extension ω=10,12DONE
  12. 12PMR analytic large-ω expectation auditDONE
  13. 13Dense CNG discovery scan ω∈[9.8,10.3]DONE
  14. 14CNG window confirmation ω∈[10.40,10.90]DONE
  15. 15Normalized finite-support self-cancellationDONE
  16. 16Published HH curve comparison (narrow)DONE
  17. 17Hadamard e derivation candidateDONE
  18. 18Repaired scalar trace at r=6M (empirical)DONE
  19. 19Omitted-mode remainder controlOPEN
  20. 20Independent trace at r=5.5M and 6.5MOPEN
  21. 21Independent tensor componentsOPEN
  22. 22External Mτ source / sign clarificationOPEN
  23. 23WardHOLD
  24. 24Four-point benchmarkHOLD
  25. 25Infinite-support generalized integralHOLD
  26. 2635-row production gridLOCKED
  27. 27B1 reproductionLOCKED
  28. 28B2 BoulwareLOCKED
  29. 29Novel fixed-background geometryLOCKED
  30. 30BackreactionLOCKED
  31. 31Stability / QEI / ANECLOCKED
  32. 32Physical-scale / engineering questionLOCKED