Program dependency chain
Calibration first. Engineering last.
October research update: scalar calculation repaired; independent trace agreement at r=6M under an empirical numerical allowance. Broader geometry, backreaction, and engineering stay locked. GATE = NO.
Intended progression
- Known physics
- Calibrate
- Scalar r=6 empirical
- Validate
- Test new geometry
- Calculate quantum stress
- Backreaction
- Admissibility
- Stability
- Physical scale
We are not at Level 4 or above. B1 itself is PARTIAL. A narrow CNG window pass and a narrow published-curve comparison are not a B1 pass. The current open work is remainder control, neighboring traces, then tensor components. GATE = NO.
Instrument chain
What B1 would unlock, and what stays locked
Calibration
- B0 bitensor / thermal checksumDONE
- B1 Schwarzschild Hartle–HawkingCURRENT · PARTIAL
- PMR adaptive angular-convergence gatePROSPECTIVE PASS · CLOSED GATE
- PMR sparse 10/12 + asymptotic auditDONE · MIXED / GROWTH EXPECTED PRE-GI
- CNG discovery scan ε₁=37.520 SEP FREEZE · D FAIL RETAINED
- CNG confirmation scan 10.40–10.90NARROW PASS · 21 SEP · NOT GLOBAL
- Published HH curves12/12 NARROW · CHAIN INVALID
- Scalar trace at r=6MEMPIRICAL PASS · NOT FULL RSET
Multi-benchmark validation
- B2 BoulwareLOCKED
- B3 additional states / geometriesLOCKED
Discovery mode
- Novel fixed-background geometryLOCKED
Self-consistent physics
- Semiclassical backreactionLOCKED
Admissibility
- QEI / ANEC / regularity / stabilityLOCKED
Physical scale
- Macroscopic viabilityLOCKED
Engineering
- Only if everything above survivesLOCKED
Future and locked stages are not accomplished. B1 is CURRENT and PARTIAL. PMR gate PASS is instrument work, not a B1 pass. GATE = NO.
Branch G technical roadmap
Live stack, unchanged
This is the existing Branch G ledger. Stamps are not promotional. HOLD is not PASS. LOCKED stages have not been run.
- 01Radial GreenDONE
- 02Hadamard source / subtraction (historical scope)DONE
- 03⟨φ²⟩DONE
- 04⟨φ²⟩ derivatives (old tolerance)DONE
- 05Initial four-point RSET assembly machineryDONE
- 06Trace machinery (not the October comparison)DONE
- 07Public Mτ reproducibility packDONE
- 08PMR ℓ-support isolationDONE
- 09ω=8 angular plateauDONE
- 10Adaptive angular-convergence gate (prospective)DONE
- 11Certified sparse extension ω=10,12DONE
- 12PMR analytic large-ω expectation auditDONE
- 13Dense CNG discovery scan ω∈[9.8,10.3]DONE
- 14CNG window confirmation ω∈[10.40,10.90]DONE
- 15Normalized finite-support self-cancellationDONE
- 16Published HH curve comparison (narrow)DONE
- 17Hadamard e derivation candidateDONE
- 18Repaired scalar trace at r=6M (empirical)DONE
- 19Omitted-mode remainder controlOPEN
- 20Independent trace at r=5.5M and 6.5MOPEN
- 21Independent tensor componentsOPEN
- 22External Mτ source / sign clarificationOPEN
- 23WardHOLD
- 24Four-point benchmarkHOLD
- 25Infinite-support generalized integralHOLD
- 2635-row production gridLOCKED
- 27B1 reproductionLOCKED
- 28B2 BoulwareLOCKED
- 29Novel fixed-background geometryLOCKED
- 30BackreactionLOCKED
- 31Stability / QEI / ANECLOCKED
- 32Physical-scale / engineering questionLOCKED