Skip to content

VAL-B1-PMR-CNG-DISCOVERY · HISTORICAL FREEZE · 2026-09-20 · NOT THE LIVE FRONTIER

PMR CNG Discovery Scan

As written on 2026-09-20, before the unseen window was computed: substantial numerical evidence for a predeclared ε₁=37.5 oscillation, surrogate INVALIDATED, offline re-score UNCLASSIFIED_CRITERIA_GAP, confirmation still running. On 2026-09-21 that window received a narrow pass. This page keeps the discovery grades. D = FAIL and F = CRITERIA_GAP are not erased. The live frontier is now the 9 October scalar trace.

FREEZE 2026-09-20AS WRITTEN THAT DAY: SCAN NOT YET COMPUTEDLATER NARROW PASS 2026-09-21OLD SURROGATE INVALIDATEDF CRITERIA GAPD FAIL RETAINEDGLOBAL NOT ESTABLISHEDGATE NO

Checkpoint ladder

  1. THEORY

    Pointwise decay of F_reg required

    NO
  2. THEORY

    Asymptotic structure

    MIXED
  3. THEORY

    Global mixed-structure confirm

    FALSE
  4. SCAN

    ω∈[9.8,10.3] Δω=0.01

    51/51 ANGULAR_ACCEPTED
  5. SCAN

    ε_n predeclared / never fitted

    TRUE
  6. METHOD

    Old surrogate discriminator

    INVALIDATED
  7. RESCORE

    A nested H0 vs H1

    PASS · R² 0.084 → 0.997
  8. RESCORE

    B dominant |P|

    PASS · ε₁ 6.72×
  9. RESCORE

    C split-window phase

    PASS · Δφ≈0.035 rad
  10. RESCORE

    D cross-half predict

    FAIL · retained
  11. RESCORE

    E cross-component

    PASS · θθ ~π-shifted
  12. RESCORE

    F smooth-null bootstrap

    F_CRITERIA_GAP
  13. RESCORE

    Overall

    UNCLASSIFIED_CRITERIA_GAP
  14. WORDING

    Numerical CNG confirmed

    DO NOT SAY
  15. NEXT

    Confirm scan ω∈[10.40,10.90]

    AS OF 2026-09-20: NOT YET COMPUTED · LATER NARROW PASS
  16. LOCK

    OUR_NUMERICAL_CNG_STRUCTURE_CONFIRMED

    FALSE
  17. LOCK

    Abel / HH / GATE

    FALSE / FALSE / NO
  1. 01 · Literature expectation

    ASYMPTOTIC_STRUCTURE_MIXED

    Levi–Ori t-splitting subtracts only the local coincidence polynomial. Remote connecting-null-geodesic oscillations remain. Pointwise decay of F_reg is not required before generalized integration. Published envelope at r=6M includes ∼ω^{5/2} for the relevant RSET integrand.

  2. 02 · Discovery evidence

    STRONG EVIDENCE

    Dense angular-gated scan 9.8≤ω≤10.3, Δω=0.01, 51/51 accepted. Predeclared ε_n never fitted. Fixed ε₁=37.5 H1 explains R²≈0.997 of F_reg^tt. Dominant residual projection is ε₁ by 6.72×. Split-window and tensor-component phases cohere. Not confirmation.

  3. 03 · Independent confirmation

    AS WRITTEN 2026-09-20: NOT YET COMPUTED

    Frozen before computation: non-overlapping window 10.40≤ω≤10.90, Δω=0.01, 51 points, ε₁=37.5 fixed. That is the 20 September wording. On 21 September this pipeline recorded a narrow pass of the predeclared oscillation. It is not a global confirmation. See the confirmation study.

Plot 1 · discovery scan

F_reg^tt versus ω, 9.8–10.3

51 ANGULAR_ACCEPTED points. Solid: cubic + fixed ε₁=37.5 (H1, R²≈0.997). Dashed: smooth cubic only (H0, R²≈0.084). Frequency was never fitted.

Historical 20 September 2026 discovery freeze: 51/51 at r=6M, ω∈[9.8,10.3], substantial evidence for predeclared ε₁=37.5. As written that day, the confirmatory window had not been computed. On 21 September that window received a narrow pass. Discovery grades D=FAIL and F=CRITERIA_GAP remain. Global structure is not established.

OFFLINE_RESCORE_UNCLASSIFIED_CRITERIA_GAP · CONFIRMED = FALSE

Qualifiers

  • Do not say numerical CNG confirmed.
  • Do not flatten literature expectation, discovery evidence, and independent confirmation.
  • Do not retune the old surrogate discriminator.
  • Do not change F from CRITERIA_GAP to HOLD.
  • Do not erase historical D=FAIL.
  • Do not run Abel. Do not claim HH RSET. Do not flip the production sign. GATE = NO.

Correction chain

  1. 2026-09-19

    Analytic audit GROWTH_EXPECTED_PRE_GI. Sparse 10/12 ANGULAR_ACCEPTED.

  2. scan

    Dense window 9.8–10.3, 51/51 accepted. ε_n predeclared.

  3. surrogate

    Old discriminator INVALIDATED_DO_NOT_USE_FOR_CNG_DECISION.

  4. rescore

    A/B/C/E PASS, D FAIL, F CRITERIA_GAP. Overall UNCLASSIFIED_CRITERIA_GAP.

  5. next

    As written on 2026-09-20, the confirmation window 10.40–10.90 was frozen and not yet computed.

  6. 2026-09-21

    That window later received a narrow pass. Discovery grades on this page are unchanged.

Updated 2026-09-20. All checkpoints · VAL-B1-SCALAR-TRACE-R6 · VAL-B1-PMR-CNG-CONFIRMATION · VAL-B1-PUBLISHED-HH-CURVES · VAL-B1-HADAMARD-E-CANDIDATE · VAL-B1-PMR-ASYMPTOTIC-AUDIT · VAL-B1-PMR-ANGULAR-GATE · VAL-B1-MTAU-SIGN-REPRO · VAL-B1-EXTCOORD-HH · VAL-B1-EXTCOORD-PHI2-DERIV · VAL-B1-EXTCOORD-RSET-4PT · VAL-B1-HOWARD-242-246