Skip to content

VAL-B1-EXTCOORD-HH · ACTIVE PRODUCTION-DEVELOPMENT ROUTE · RSET HOLD

B1 Extended-Coordinate Hartle–Hawking Clean-Room RSET

Pre-RSET stack remains a historical pass under the implementation and tolerances of that date. October 9 found a massless-tail omission and a wrong static-mode boundary coefficient; those corrections are recorded on the scalar-trace page and do not silently rewrite this ladder. Ward, Howard 4pt, and four-point DEV remain HOLD. The 20 September confirmation was not yet computed; it later received a narrow pass. B1 is not claimed. The current trace claim is only the r=6M empirical comparison.

B1 PARTIALTRACE HISTORICAL · NOT UNIVERSALWARD HOLDCNG DISCOVERY 2026-09-20CNG WINDOW NARROW PASSSCALAR TRACE EMPIRICALMTAU PAUSEDRSET HOLDGATE NO

Checkpoint ladder

  1. SOURCE / DERIVATION

    TBO source provenance

    PASS
  2. SOURCE / DERIVATION

    Howard Table III source

    PASS
  3. SCALAR

    ⟨φ²⟩ convergence

    PASS
  4. SCALAR

    ⟨φ²⟩ derivatives

    PASS
  5. TENSOR

    RSET source assembly

    PASS
  6. TENSOR

    Synge reconstruction

    PASS
  7. TENSOR

    Direct TBO referee source

    PASS
  8. TENSOR

    Angular referee

    PASS
  9. TENSOR

    Trace

    HISTORICAL PASS · NOT THE OCTOBER COMPARISON
  10. TENSOR

    Ward

    HOLD
  11. TENSOR

    Howard 4pt

    HOLD
  12. INSTRUMENT

    PMR adaptive angular gate

    PROSPECTIVE PASS
  13. INSTRUMENT

    PMR sparse 10/12

    ANGULAR_ACCEPTED
  14. INSTRUMENT

    PMR asymptotic expectation

    MIXED · GROWTH EXPECTED PRE-GI
  15. INSTRUMENT

    CNG discovery scan

    STRONG EVIDENCE · NOT CONFIRMED
  16. INSTRUMENT

    CNG confirmation scan

    NARROW PASS 2026-09-21 · NOT GLOBAL
  17. LITERATURE

    Mτ source/convention issue

    EXTERNALLY REVIEWABLE · PAUSED
  18. DEV

    RSET assembly DEV

    HOLD
  19. DEV

    Four-point DEV

    HOLD
  20. FRONTIER

    Production grid

    LOCKED
  21. FRONTIER

    B1 reproduction

    NOT CLAIMED
  22. FRONTIER

    Physical gate

    NOT REACHED

The pre-RSET numerical foundation (radial Green, Hadamard, Ψ⁺, ⟨φ²⟩, nested-h derivatives) remains PASS where previously validated.

Assembly machinery and trace checks have advanced. They do not promote the production RSET. Ward does not yet satisfy the full conservation/Howard gate. The displayed mixed-time derivative formula remains EXTERNALLY REVIEWABLE, not confirmed, and the Mτ lane is paused.

Do not flip the production Mτ sign. Do not assemble a 35-row Howard grid. Do not run Abel. A later PASS does not rewrite an earlier HOLD. DIRECT_LOG_5E3 FAIL_EDGE remains preserved beside DIRECT_LOG_1E2 PASS.

Qualifiers

  • HOLD and LOCKED are not PASS. EXTERNALLY REVIEWABLE is not PASS.
  • No truncated number is a physical value.
  • This page does not launch the RSET burn, Abel production, author email, or a production sign flip.

Updated 2026-09-19. All checkpoints · VAL-B1-SCALAR-TRACE-R6 · VAL-B1-PMR-CNG-CONFIRMATION · VAL-B1-PUBLISHED-HH-CURVES · VAL-B1-HADAMARD-E-CANDIDATE · VAL-B1-PMR-CNG-DISCOVERY · VAL-B1-PMR-ASYMPTOTIC-AUDIT · VAL-B1-PMR-ANGULAR-GATE · VAL-B1-MTAU-SIGN-REPRO · VAL-B1-EXTCOORD-PHI2-DERIV · VAL-B1-EXTCOORD-RSET-4PT · VAL-B1-HOWARD-242-246