Skip to content

VAL-B1-PMR-CNG-CONFIRMATION · CLOSED NARROW WINDOW · NOT GLOBAL · NOT THE LIVE FRONTIER

CNG confirmation window, narrow pass

On 21 September 2026 this pipeline’s predeclared oscillatory structure passed on the unseen window ω ∈ [10.40, 10.90], 51/51 angular-accepted, ε₁ = 37.5 fixed and never fitted. The accepted record reports C1–C6 PASS. C5 was corrected from sequential residual fitting to joint-H1 source A/B transfer plus a fresh target cubic. This is not global asymptotics and does not erase the 20 September discovery grades.

NARROW PASS 2026-09-21C1–C6 PASS ON ACCEPTED RECORDC5 CORRECTEDGLOBAL NOT ESTABLISHEDD FAIL RETAINEDF CRITERIA GAP RETAINEDNOT HH RSETGATE NO

Checkpoint ladder

  1. WINDOW

    ω ∈ [10.40, 10.90]

    51/51 ANGULAR-ACCEPTED
  2. WINDOW

    ε₁

    37.5 FIXED · NOT FITTED
  3. GRADE

    Accepted record C1–C6

    PASS
  4. GRADE

    C5 method

    JOINT-H1 TRANSFER · FRESH TARGET CUBIC
  5. REPLAY

    9 Oct directional R²

    AGREES AT ROUNDOFF
  6. HISTORY

    20 Sep discovery D

    FAIL RETAINED
  7. HISTORY

    20 Sep discovery F

    CRITERIA_GAP RETAINED
  8. LOCK

    Global CNG structure

    NOT ESTABLISHED
  9. LOCK

    Infinite-frequency integral

    NOT VALIDATED

Accepted directional R²: 0.9988049064965246 and 0.9985764043986991. The 9 October replay from the saved grid: 0.9988049064965255 and 0.9985764043986983. The last digits differ at floating-point roundoff. Both pairs are shown. The replay is not a new fit.

The confirmation grid SHA-256 is cited as 3b85d57c14510e1c53b008e792860b9376e3236d55cdd5b4954e4bd26a6b0289. That grid file is not in the public package and is not offered as a download.

Individual definitions of C1, C2, C3, C4, and C6 are not in the public package. Only the statement that the accepted record reports C1–C6 PASS, plus the C5 correction, is published here. Older C5 audit JSON contains intermediate variants; those are not the final statistic, and the intermediate numbers are not invented on this site.

Earlier HOLD and PASS_CONDITIONAL marks stay. OUR_NUMERICAL_CNG_STRUCTURE_CONFIRMED stays false.

Qualifiers

  • Do not call this a global CNG confirmation.
  • Do not erase D = FAIL or F = CRITERIA_GAP from the 20 September discovery page.
  • Do not offer the confirmation grid as a download.

Correction chain

  1. 2026-09-20

    Discovery freeze. Confirmation not yet computed. Overall UNCLASSIFIED_CRITERIA_GAP.

  2. 2026-09-21

    Narrow window pass. Accepted C1–C6. C5 corrected.

  3. 2026-10-09

    Replay of the corrected C5 statistic agrees at roundoff.

Updated 2026-09-21. All checkpoints · VAL-B1-SCALAR-TRACE-R6 · VAL-B1-PUBLISHED-HH-CURVES · VAL-B1-HADAMARD-E-CANDIDATE · VAL-B1-PMR-CNG-DISCOVERY · VAL-B1-PMR-ASYMPTOTIC-AUDIT · VAL-B1-PMR-ANGULAR-GATE · VAL-B1-MTAU-SIGN-REPRO · VAL-B1-EXTCOORD-HH · VAL-B1-EXTCOORD-PHI2-DERIV · VAL-B1-EXTCOORD-RSET-4PT · VAL-B1-HOWARD-242-246